INTENSIFICATION OF SUB-LEVEL CAVING ORE USING
SELF-PROPELLED EQUIPMENT
O.Ye. Khomenko1*,
A.V. Kosenko2, S.V. Dmitrenko3
1Dnipro University of Technology, Dnipro, Ukraine
2Institute for Physics of Mining Processes
of the National Academy of Sciences of Ukraine, Dnipro, Ukraine
3PJSC “Kryvyi Rih Iron Ore Plant”,
Kryvyi Rih, Ukraine
* Corresponding
author: e-mail: homenkoo@nmu.org.ua
Physical and
technical problems of mining production, 2021, (23), 136-148.
https://doi.org/10.37101/ftpgp23.01.010
full
text (pdf)
ABSTRACT
Purpose. Creation
of high-performance technology for the development of rich iron
ores with the integrated use of self-propelled
mining equipment in the deep
horizons of the mine "Batʹkivshchna" PJSC "Kryvyi
Rih iron ore plant".
Methods. The
following research methods were used in the
work: analytical in the analysis
of mining-geological and mining conditions of development of deposits of rich iron ores
in the field of the
mine "Batʹkivshchna"
of PJSC "Kryvyi Rih Iron Ore
Plant"; technological
design – at development of the technological scheme of sub-level
caving with use of self-propelled
mining equipment; economic and mathematical in determining the main technical and economic indicators for the options of the system
of sub-level caving.
Findings. The
efficiency of implementation in practice of the offered variant of the sub-level caving with complex use of self-propelled equipment on all processes of cleaning works is proved.
Originality. Rational
parameters for the variant of the sub-level
caving with complex use of self-propelled equipment on all processes of cleaning works are established
and dependences of change of
economic efficiency at its application
on parameters of process of delivery are received.
Practical implications. The developed version of the sub-level caving using self-propelled mining equipment can be used both
in the development of medium capacity and powerful ore deposits, and in the
development of very powerful ore deposits and increases productivity on technological processes: drilling preparatory and threaded horizontal workings twice and vertical
– 4 times; drilling of deep wells
– 2.2 times; delivery of ore mass
in 3 times – and also the
worker on development system in 2.6 times.
Keywords: sub-level
caving, self-propelled equipment, mining and geological conditions, rich iron ore, development,
face-entry drivage, actual mining
REFERENCES
1. Khomenko, O.Ye.,
Kononenko, M.N. (2016). Vskrytiye
i podgotovka rudnykh mestorozhdeniy pri podzemnoy razrabotke. D.: NGU, 101 s.
2. Kononenko, M.M., Khomenko, O.Ye., Usatyy, V.Yu. (2013). Vybir i rozrakhunok
system pidzemnoyi rozrobky
rudnykh rodovyshch. D.:
NHU, 217 s.
3. Stupnik, N.I., Kudryavtsev,
M.I., Basov, A.M. (2010). Puti sovershenstvovaniya tekhnologii
podzemnoy razrabotki bogatykh zheleznykh rud Krivbassa. Vísnik KTU, (26), 4–6.
4. Fedʹko, M.B., Zenyuk,
D.F. (2011). Udoskonalennya systemy
rozrobky z pidpoverkhovym
obvalennyam rudy. Visnyk KTU, (29), 4–6.
5. Stupnik, M.I., Kalinichenko,
O.V., Kalinichenko, V.O. (2012). Tekhniko-ekonomichne obgruntuvannya
dotsilʹnosti zastosuvannya
samokhidnoyi tekhniky na shakhtakh Kryvbasu. Naukovyy visnyk Natsionalʹnoho hirnychoho universytetu, (5),
39–42.
6. Tarasyutin V.M., & Kosenko A.V. (2018). Obhruntuvannya
resursozberihayuchykh tekhnolohichnykh
protsesiv pry pidzemnomu
vydobutku riznosortnykh
zaliznykh rud Kryvbasu. Visnyk KNU, (46),
152–159.
7. Chernokur, V.R., Shkrebko,
G.S., Shelegeda, V.I. (1992). Dobycha
rud s podetazhnym obrusheniyem. M.: Nedra, 271
s.
8. Sraj Banda Umar (2013). Rock Mass Characterization and
Conceptual Modeling of the Printzsköld
Orebody of the Malmberget Mine, Sweden / Sraj Banda Umar, Jonny Sjöberg
and Erling Nordlund.
Journal of Earth Sciences and Geotechnical Engineering, 3(4),
147–173.
9. Castro, R.L.,
Vargas, R., Huerta, F. (2012). Determination of drawpoint
spacing in panel caving: a case study at the El Teniente
Mine. The Journal of The Southern African Institute of Mining and
Metallurgy, (112), 871–876.
10. Blachowski, J., Ellefmo, S.
(2012). Numerical modelling of rock mass deformationin
sublevel caving mining system. Acta Geodyn. Geomater, 9(3(167)),
379–388.
11. Kalinichenko, V.A., Zhukov, S.A., Kalinichenko
Ye.V. Tendentsii v razvitii gornodobyvayushcheg kompleksa i problemy tekhnicheskogo perevooruzheniya podzemnykh rudnikov. Krivoy Rog:
Mineral, 172 s.
12. Belogorodtsev, O.V., Gromov, Ye.V.,
Mel'nik, V.B. (2016). Obosnovaniye
sistem razrabotki i ikh konstruktivnykh
parametrov v usloviyakh
intensifikatsii dobychi
pri otrabotke zapasov glubokikh gorizontov moshchnykh rudnykh mestorozhdeniy. Gornyy informatsionno-analiticheskiy
byulleten', (4), 122–130.
13. Kosenko A.V. (2017). Udoskonalennya
ta obgruntuvannya proektnykh
rishenʹ u razi zastosuvannya samokhidnoyi navantazhuvalʹno-dostavochnoyi tekhniky
na tekhnolohichnomu protsesi dostavky rudnoyi masy (na prykladi shakhty «Oktyabrsʹka»
PAT «Kryvbaszalizrudkom»). Molodyy
vchenyy, 2 (42), 183–190.
14. Kuz'min Ye.V. (2015). Sovremennyye tendentsii v tekhnologi podzemnoy razrabotki rudnykh mestorozhdeniy. Vestnik Rossiyskoy akademii yestestvennykh nauk (4), 2–4.
15. Tarapata, V.YA., Karamanits, F.I., Richko,
V.S., Pluzhnik, YU.A. (2011). Perspektivy
tekhnicheskogo i tekhnologicheskogo perevooruzheniya
podzemnoy dobychi rudy na glubokikh
gorizontakh shakht Krivbassa, Vísnik KTU,
(28), 3–6.
|